Usance Letter of Credit (MT700) — Full Guide & Bank Directory

Everything you need for deferred-payment LCs: documents, banks (complete list), pricing, structures, risks, and compliance. Fully aligned with UCP 600 and SWIFT MT700.

Tenors: 30–360+ days Sight / Usance / Confirmed / Transferable Discounting & Acceptance options Global bank network

📂 Documents Required for Usance LC Issuance

  • Proforma Invoice / Sales Contract
  • Company Legal Documents (license, registration, articles)
  • Commercial Invoice
  • Packing List
  • Certificate of Origin
  • Inspection Certificate (if required)
  • Insurance Certificate (if applicable)
  • Bill of Lading / Air Waybill

Additional (if applicable)

  • Draft / Bill of Exchange
  • Beneficiary Certificate
  • Installation / Completion Certificates (projects)
  • Technical Specifications
  • Environmental Compliance (for green LCs)

Why Usance LC?

  • Extended terms & working-capital optimization
  • Bank obligation at maturity against compliant docs
  • Discounting / post-shipment finance available
  • Ideal for manufacturing cycles and projects

🏦 Banks & Financial Institutions Supporting Usance LC — Complete List

Use filters to navigate the full directory. Toggle “unique only” to remove duplicates from multi-source listings.

Rank Tier Bank Name SWIFT Country LC Types Amount Range Term Issuance Fee Processing Time Special Features CTA

Usance LC Specialized Structures

Structure TypeDescriptionBest ForKey Benefits
Standard UsanceSingle payment at fixed future dateGeneral trade, mid-value goodsSimplicity, lower fees
Installment PaymentMultiple scheduled paymentsCapital equipment, major projectsAligns cash flow to milestones
Transferable UsanceTransfer to supplier/manufacturerTrading companiesPass-through tenor to suppliers
Confirmed UsanceConfirming bank adds guaranteeHigher-risk countriesReduces country/bank risk
Green / SustainablePreferential terms for green projectsRenewables, ESG tradeBetter rates, extended terms
Supplier Finance EnabledIntegrates with SCF programsOEMs / distributorsEarly payment to suppliers
Multi-DrawingMultiple shipments under one LCOngoing supply contractsLower admin, consistent terms
Project-LinkedPayment tied to project phasesInfrastructure, constructionPredictable capital planning

Usance LC Issuance Process

  1. Application: transaction specifics + desired tenor
  2. KYC & Credit Review
  3. Term Sheet: payment schedule & clauses
  4. Draft LC (MT700) review & approval
  5. Fees/Collateral (as applicable)
  6. SWIFT Issuance (MT700) to advising bank
  7. Advising / Confirmation (if required)
  8. Document Checking; Maturity Management
  9. Payment at maturity / Discounting if used

Usance LC Term Options

Term LengthTypical UsageIndustriesFinancing Options
30–90 DaysStandard tradeGeneral merchandiseDiscounting, forfaiting
91–180 DaysManufacturing cyclesConsumer goods, electronicsDiscounting, post-shipment
181–270 DaysSeasonal demandAgriculture, fashionInventory financing
271–365 DaysCapital projectsConstruction, infraProject finance
366–730 DaysComplex buildsHeavy machineryCapital leasing

Usance LC Pricing Structure

  • Issuance Fee: typically 0.25%–2% of LC amount
  • Maturity Interest: based on tenor and risk
  • Confirmation (documentary credit) fee: 0.25%–1%
  • Discounting / Acceptance fees (if used)
  • Commitment / Amendment fees as applicable
  • Collateral / Security costs (case-by-case)

Risk Mitigation & Compliance

Risks & Mitigation

RiskMitigationExample
Credit RiskFinancials & credit reportsRegular credit assessments
Country RiskConfirmed LCsSecondary bank guarantee
Documentary RiskStrict doc checkingUCP 600 compliance
Market RiskHedgingFX forwards, swaps
OperationalControls & auditsDual checks
LegalLocal law reviewCounsel opinion

Compliance

  • AML & KYC (full onboarding)
  • Sanctions Screening (OFAC, UN, EU, etc.)
  • UCP 600 & ISBP alignment
  • Accurate MT700 field verbiage
  • Documentary compliance before maturity
  • Reporting per local & international rules

Case Studies

Capital Equipment (365d)

1-year usance matched ramp-up revenue; production +30% without cash strain.

Infrastructure (730d, installments)

Milestone-linked LC synchronized payments with project phases.

Seasonal Agro (270d)

Harvest-aligned maturity smoothed working-capital swings.

  • Digital issuance & document checking
  • Green financing & ESG terms
  • Supply-chain integration (SCF/discounting)
  • Heightened regulatory compliance
  • Advanced risk mitigation for volatility

Client Reviews (20)

Frequently Asked Questions (15)

Important: All transactions comply with international banking regulations and UCP 600 guidelines. Nothing herein is financial or legal advice; issuance is at the bank’s discretion after full due diligence.

Need a Usance LC draft? Email WhatsApp