Guarantee of Completion of Work | Sovereign-Backed Assurance for Project Delivery
🔹 Performance Bond Alternative | Force Majeure Protection | SWIFT MT760 Issuance
⚠️ Facing Contractor Default Risks?
A 2 BLNG terminal project was delayed by 18months when the EPC contractor went bank rupt.
Our Completion Guarantee enabled:
✅100
✅350M Cost Overrun Coverage through syndicated bank/insurance wrap
✅ Penalty Avoidance for missed milestones
« NNRV’s guarantee became our project’s safety net. Their contingency fund covered 90 days of unexpected delays without triggering default. »
– Project Director, Energy Megaproject, Qatar
💼 What is a Guarantee of Completion?
A bank-issued undertaking ensuring project delivery regardless of contractor failure:
▪ Covers Abandonment Risks (Financial/technical contractor default)
▪ Funds Completion Costs (Activated via independent engineer certification)
▪ Multi-Tier Enforcement (Step-in rights for lenders/off-takers)
Governed By:
✔ FIDIC Silver Book (Sub-Clause 4.2)
✔ ICC Uniform Rules (URDG 758)
✔ OECD Anti-Corruption Compliance
✅ Key Structural Benefits
Feature | Project Owner Benefit | Lender Assurance |
---|---|---|
Pre-Qualified Contractor Pool | Seamless transition | No value erosion |
Liquidated Damage Coverage | Protects ROI | Debt service continuity |
FX Fluctuation Buffer | Up to 15% currency hedge | Eliminates convertibility risk |
Tech Failure Protection | Covers design flaws | Ensures operational viability |
🏦 Approved Issuing Institutions
Institution | Sector Specialty | Max. Tenor | Coverage Cap |
---|---|---|---|
HSBC Infrastructure | Energy/Petrochemicals | 15 years | $1.5B |
Zurich Construction | Transportation Mega-Projects | 12 years | €800M |
Mitsubishi UFJ | Asian PPP Projects | 20 years | ¥100B |
Citibank Sovereign Wrap | Americas Social Infrastructure | 10 years | $500M |
(🌐 Multilateral development bank enhancements available)
📋 Documentation Requirements
✔ EPC Contract (With termination/step-in clauses)
✔ Independent Engineer Report (Technical feasibility)
✔ Project Schedule (Critical path analysis)
✔ Cost Breakdown (With escalation mechanisms)
✔ Political Risk Assessment
🔄 7-Stage Implementation
Contract Review (Identify completion risk exposures)
Contingency Pricing (Actuarial cost modeling)
Syndication (Bank/insurance participation)
Trigger Matrix (Performance vs payment tests)
Security Package (Escrow/reserve accounts)
SWIFT Issuance (MT760 with milestone triggers)
Monitoring (Satellite/BIM progress tracking)
📊 Guarantee Comparison
Instrument | Coverage Scope | Enforceability | Tenor Flexibility |
---|---|---|---|
Completion Guarantee | Full project delivery | ⭐⭐⭐⭐⭐ | 5-20 years |
Performance Bond | Contract value % | ⭐⭐⭐ | 1-3 years |
Retention Money | 5-10% of works | ⭐⭐ | Project duration |
🚀 NNRV Differentiators
✔ Global Contractor Database (5,000+ pre-vetted replacement firms)
✔ Delay Cost Calculator (AI-powered overrun forecasting)
✔ Sovereign Risk Shield (Government co-guarantee structures)
✔ Dispute Resolution Fast-Track (ICC pre-registered arbitration)
📌 Market Parameters
Minimum Project Size: $25M (lower for DFI-backed projects)
Pricing: 1.8-4.5% p.a. of guaranteed amount
Coverage Ratios: 80-110% of remaining completion costs
🌍 Project Successes
« Completed Panama hospital PPP after original contractor insolvency using NNRV’s guarantee. » – Health Ministry, Panama
« Recovered $180M in delay penalties through guaranteed milestone enforcement. » – Infrastructure Fund, Australia
📞 Secure Your Project Completion
[📥 Download Engineering Risk Assessment Template]
[🏗 Request Contractor Pre-Qualification Review]
🏛 Certified By:
▪ FIDIC Guarantee Standards
▪ World Bank PPP Certification
▪ Global Infrastructure Hub