NNRV Trade Partners — MT740 Reimbursement LC • 20 Banks • 15 FAQs • 15 Reviews

MT740 Reimbursement — Seamless Payouts for Confirmed Letters of Credit

We structure confirmed LC flows where the issuing bank authorizes a reimbursing bank via MT740, enabling the confirming bank to be paid promptly after compliant presentation.

UCP 600 • ICC KYC/AML & Sanctions Screening 100+ Countries • 200+ Institutions 24–48h Intake

How It Works

  1. Issuing Bank issues LC (MT700).
  2. Confirming Bank adds confirmation (via MT710 or directly).
  3. Issuing Bank sends MT740 to Reimbursing Bank.
  4. Confirming Bank presents docs & requests reimbursement.
  5. Reimbursing Bank pays per MT740 authorization.

Clear SWIFT choreography → faster, traceable settlements.

🎯 Why Use MT740?

FeatureBenefit
Reimbursing bank authorizedConfirming bank’s payout is pre-cleared
SWIFT standardAuditability & end-to-end traceability
Confirmed LC supportFits MT700/MT710 confirmations
Faster turnaroundClear reimbursement instruction
Complex chainsIdeal where 3+ banks are involved

📂 Documents Required for MT740 Execution

  • Final LC (MT700/MT710) with confirmation & reimbursement clause
  • Reimbursement agreement between issuing & reimbursing banks
  • SWIFT-enabled credentials for all banks involved
  • Seller’s documents: commercial invoice, B/L/AWB, inspection report, etc.
  • Bank compliance files: KYC/AML, sanctions screening as required

We verify field consistency across all messages (MT700/710/740/747).

🏦 Trusted Banks That Accept/Support MT740 Reimbursements (Selection)

Indicative list (20). Availability depends on corridor, appetite, and inter-bank arrangements.

Reimbursing / Paying Bank SWIFT/BIC Strengths / Notes Typical Settle Time Typical LC Range
JPMorgan Chase, New YorkCHASUS33Global reach, fast SWIFT matching1–3 days$0.5–100M
Commerzbank, FrankfurtCOBADEFFStrong EU reimbursement2–4 days$0.5–80M
HSBC, LondonMIDLGB22Asia-EU corridor specialist1–2 days$1–200M
Standard Chartered, DubaiSCBLAEADMEA hub2–3 days$0.25–50M
State Bank of IndiaSBININBBAsia local reimbursements2–5 days$0.25–20M
Citi, New YorkCITIUS33Global payouts, multi-ccy1–3 days$1–200M
Bank of New York MellonIRVTUS3NUS dollar clearing strength1–3 days$1–150M
Deutsche Bank, FrankfurtDEUTDEFFWell-established reimbursement desks2–4 days$1–150M
Barclays, LondonBARCGB22GBP/EUR corridors1–3 days$0.5–75M
BNP Paribas, ParisBNPAFRPPEU anchor2–4 days$1–150M
Crédit Agricole, ParisAGRIFRPPStructured trade support2–4 days$0.5–80M
Bank of China, Hong KongBKCHHKHHXXXAPAC EPC flows2–4 days$1–150M
China Construction Bank, Hong KongCCBQHKAXLarge-ticket capacity2–4 days$1–200M
DBS Bank, Hong KongDHBKHKHHAPAC execution2–3 days$0.5–100M
Standard Chartered, Hong KongSCBLHKHHXXXGlobal network2–3 days$0.5–100M
UOB, SingaporeUOVBSGSGSEA corridors2–3 days$0.5–80M
First Abu Dhabi BankNBADAEAAGCC project flows2–4 days$1–150M
Mashreq Bank, UAEBOMLAEADAgile reimbursements2–3 days$0.25–50M
Société Générale, ParisSOGEFRPPEU project finance2–4 days$0.5–80M
UniCredit, MilanUNCRITMMEUR-based trade flows2–4 days$0.5–80M

Figures are indicative. Final eligibility depends on inter-bank agreements, corridor, sanctions, and compliance.

🔑 Key MT740 Fields We Validate

FieldPurpose
20Sender’s reference
21Related reference (LC)
32BCurrency/amount authorized
57aAccount with bank
58aBeneficiary bank (confirming)
72Sender to receiver information

📌 Quick Guides by Role

  • Issuing Banks: Align LC text & reimbursement terms; pre-agree reimbursing bank.
  • Confirming Banks: Ensure LC & MT740 parity; prepare clean presentation workflow.
  • Reimbursing Banks: Confirm arrangements; define settlement windows & cut-offs.
  • Exporters: Coordinate docs for zero discrepancies; confirm advising bank procedures.
  • Importers: Ensure contractual terms match LC and shipment realities.

❓ Frequently Asked Questions (15)

1) Do we always need a reimbursing bank?
No, but MT740 is recommended when payout is delegated to a third bank for speed and clarity.
2) Is MT740 only for confirmed LCs?
It’s commonly used in confirmed structures but can be used where reimbursement is delegated.
3) Who selects the reimbursing bank?
Typically the issuing bank; it should be referenced in the LC and reimbursement agreement.
4) How fast is reimbursement?
Often 1–4 business days after compliant presentation and claim.
5) What causes reimbursement delays?
Message mismatches (MT700/710 vs 740), cut-off times, incomplete docs, or compliance holds.
6) Can the amounts be partial?
Yes, provided the LC allows partial drawings and amounts are reconciled in MT740.
7) Which rules apply?
UCP 600 for DCs; bilateral reimbursement agreements govern payout mechanics.
8) Do you support multi-currency?
Yes; currency must align across messages and reimbursement scope.
9) What’s in an MT747?
Amendments to the reimbursement terms authorized by the issuing bank.
10) Can you add confirmation after issuance?
Often yes, via MT710 or bank advice, subject to appetite and LC wording.
11) Do you help draft LC text?
Yes—bank-ready drafts to align LC, confirmation, and reimbursement fields.
12) How do sanctions affect reimbursement?
We screen all parties, banks, vessels, and routes; hits can halt payout.
13) What minimum deal sizes do you handle?
Generally from ~$250k; larger for some corridors/banks.
14) Can you coordinate discounting?
Yes—subject to confirmer and insurer appetite.
15) Do you sign NDAs?
Yes, mutual NDAs and secure data rooms with audit logs.

💬 Client Reviews (15)

A. Karim — GCC EPC★★★★★
MT740 flow paid our confirmer in 48h. Clean execution.
L. Novak — EU Agri★★★★★
They harmonized MT700/710/740 perfectly. No discrepancies.
H. Wang — APAC OEM★★★★☆
Cut-off timing explained upfront; funds arrived next day.
P. Silva — LatAm Ports★★★★★
Reimbursing bank set early; settlement was predictable.
E. Mensah — West Africa★★★★★
Great coordination with confirming bank and insurer.
S. Ivanov — Rail★★★★★
Amendment via MT747 handled same day. Impressive.
N. O’Connor — Pharma★★★★★
Compliance was tight; zero surprises at payout.
R. Patel — Energy★★★★☆
One extra KYC loop, still settled within 72h.
K. Yamada — Electronics★★★★★
Field mapping checklist saved a week.
M. Diallo — Mining★★★★★
Discounting arranged after confirmation—smooth cash flow.
C. Rossi — Construction★★★★★
Great multi-bank orchestration and reporting.
Z. Khaled — Logistics★★★★★
They aligned LC and shipment realities perfectly.
D. Nguyen — Textiles★★★★★
Transparent fees; settlement matched the SLA.
G. Brown — Timber★★★★☆
Holiday cut-off noted in advance—no surprises.
I. Popescu — Metals★★★★★
Best LC drafting support we’ve had.

🛠️ Our Structuring Process

  1. Review MT700/710 LC confirmation terms
  2. Coordinate with issuing & reimbursing banks
  3. Draft/validate MT740 reimbursement format
  4. Ensure field consistency across messages
  5. Monitor reimbursement claims & settlement

🔍 MT740 vs Other SWIFT LC Messages

MessagePurposeUsed ByBinding?
MT700Issue main LCIssuing bank✅ Yes
MT710Advise/Confirm LCAdvising/Confirming bank✅ Yes
MT740Authorize reimbursementIssuing → Reimbursing✅ Yes
MT747Amend reimbursement termsIssuing bank✅ Yes

📩 Start an MT740-Enabled LC

We’ll route your file to the right regional desk and respond within 24–48 hours.

Email WhatsApp

Global Desks

  • Americas: Montréal • New York • Miami • São Paulo
  • Europe: London • Paris • Frankfurt • Zurich • Milan
  • Middle East: Dubai • Abu Dhabi • Doha • Riyadh
  • Africa: Casablanca • Lagos • Nairobi • Johannesburg
  • Asia: Singapore • Hong Kong • Kuala Lumpur • Mumbai
UCP 600 KYC • AML • Sanctions Institutional & Private Capital

Disclaimer: Content is informational and non-binding. All engagements are subject to full KYC/AML, sanctions checks, and final institutional approvals.

NNRV NNRV Trade Partners · Montreal HQ · Global Desks
© NNRV Trade Partners We may decline engagements that present compliance risks.